\(
\def\WIPO{World Intellectual Property Organisation}
\)
Calculating Damages When a Contract Is Performed in a Patent-Free Foreign Country.
2025
Форматы
| Формат | |
|---|---|
| BibTeX | |
| MARCXML | |
| TextMARC | |
| MARC | |
| DataCite | |
| DublinCore | |
| EndNote | |
| NLM | |
| RefWorks | |
| RIS |
Cite
Citation
Полное описание
Title
Calculating Damages When a Contract Is Performed in a Patent-Free Foreign Country.
Тип объекта
Journal article
Описание
1 electronic resource (page 257-261)
Резюме
Extract Patent Act Secs. 9, 139(2); Civil Code Sec. 249 Bb – Verdampfungstrockneranlage [Evaporation Dryer System] Official headnotes (translated from the German by David Wright-Policepayeh) a) Profits from the performance of a contract, which is causally related to a patent-infringing offer, may not be disregarded when calculating the damage caused by this offer simply because the acts carried out in the performance of this contract took place in a patent-free foreign country. b) If there is a sufficient causal connection, the injured party is generally free to calculate his damages on the basis of its own lost profit or a reasonable licence fee. c) In the event of a patent infringement, the defence that the same economic effect could also have been achieved by non-infringing acts cannot in principle lead to the exclusion of a claim for damages. d) The calculation of damages on the basis of a reasonable licence fee is not excluded simply because there is no relevant licensing practice in the industry.
Source of Description
Crossref
Серии
GRUR International ; 74, 3, 2025, 2632-8550.
Взаимосвязанные ресурсы
Published
[Oxford, England] : Oxford University Press (OUP), 2025.
Язык(и)
eng
Copyright Information
https://academic.oup.com/grurint/article/72/3/231/6998505
Запись имеется в