\def\WIPO{World Intellectual Property Organisation}
\)
The essentials of project management / Dennis Lock.
2001
B 75 LOC.E(2)
Available at WIPO Library
格式
| 格式 | |
|---|---|
| BibTeX | |
| MARCXML | |
| TextMARC | |
| MARC | |
| DataCite | |
| DublinCore | |
| EndNote | |
| NLM | |
| RefWorks | |
| RIS |
Items
详细记录
Title
The essentials of project management / Dennis Lock.
版本
Second edition.
描述
xv, 254 pages ; [28] cm
国际图书编号
0566082241
9780566082245 paperback
9780566082245 paperback
Alternate Call Number
B 75 LOC.E(2)
摘要
This is a practical primer drawn from the author's bestselling Project Management, giving a concise account of project management techniques, concentrating on the key tasks of project definition, organisation, estimating, planning and control.
书目等附注
Includes bibliographical references and index.
格式化内容附注
Part 1 Introduction: projects; project management processes; project objectives; the time/cost relationship; the Association for Project Management. Part 2 Definition: the customer's project specification; project scope; use of checklists; the constractor's initial design specification; specification of production methods; construction specification; specifications for product development projects; developing the project specification; projects which are difficult or impossible to define; reference. Part 3 Organization: effective organization and communications; project teams versus functional group or matrix organizations; functional matrix organizations; variations of the matrix organization; project team organization; which type of organization is best?; the hybrid option; organizations with more than one project manager; the project manager himself; project services group. Part 4 Work breakdown and coding: family tree hierarchy; work breakdown structures for large projects; coding systems; benefits of a logical coding system; choosing a coding system. Part 5 Cost estimating: cost format; estimatingaccuracy; classification of estimates according to confidence; standard tables; profit estimates; manufacturing estimates with no drawings; personal estimating characteristics; estimates for material and equipment costs; below-th-line costs; planning; bar charts; critical path networks; the different network notation systems; critical path networks using arrow diagrams; precedence diagrams; case study
the Gantry Project; level of detail in network diagrams; should a large network be broken down into smaller networks?; interface activities; milestones; is the predicted timescale too long?; early consideration ot resource constraints. (Part contents.).
the Gantry Project; level of detail in network diagrams; should a large network be broken down into smaller networks?; interface activities; milestones; is the predicted timescale too long?; early consideration ot resource constraints. (Part contents.).